Bibliothèque Intercommunale de Gourdon BIG Gourdon / France / 2013

8
8 Love 2,269 Visits Published
The Gourdon municipal library, situated in the historical centre, is currently set up in the ground level an old school. The first floor is taken up by an empty apartment. The purpose of this redevelopment is to use the whole building to extend the library, offering storage and direct access to 30000 books. For this style of library programme, one needs 300m² to stock 10000 works. The available surface area adds to only 500m² over the three levels, yet 900m² is needed just for storage. The strategy was therefore to make the most of the volume of the building, using the vertical surfaces of the existing walls. This arrangement frees up space in the centre of the library for a variety of different uses. The 30000 works are separated into two zones: 15000 accessible works, arranged on the 300m² of free walls and the other 15000 in an underground storage area. The children’s space is located within a separate volume, to the south. Again, the strategy is to free up the space in the centre and use the vertical surfaces for storing the works. All intermediate floors have been removed within the main body of the library. In this large volume, the walls are covered in full height shelves, on which all the books available to the public will be stored. Walkways offer access to these shelves at two intermediate levels within the space. The interior layout is the objective of this project, it has therefore been extensively studied, from the shelving to the furniture. The materials used for the amenities are white, or left rough, while bright colours have been chosen for the furniture.
8 users love this project
Comments
    comment
    user
    Enlarge image

    The Gourdon municipal library, situated in the historical centre, is currently set up in the ground level an old school. The first floor is taken up by an empty apartment. The purpose of this redevelopment is to use the whole building to extend the library, offering storage and direct access to 30000 books. For this style of library programme, one needs 300m² to stock 10000 works. The available surface area adds to only 500m² over the three levels, yet 900m² is needed just for storage. The...

    Project details
    • Year 2013
    • Work started in 2012
    • Work finished in 2013
    • Client Communauté de Communes Quercy Bouriane
    • Cost 1.2 M excl VAT
    • Status Completed works
    • Type Libraries