High Speed Train Station in Logroño | Ábalos+Sentkiewicz arquitectos

Logroño / Spain / 2011

27
27 Love 7,884 Visits Published
The station serves as a starting point of a new urban project, which re-establishes the connectivity between the North and South of the city and leads to a large public park where the roof is an integrated part giving its geometry and topography to the volume. All Stations in surface usually mean an abrupt interruption of urban continuity. Precisely, the urban element that is destined to unite and bring together the city with the territory, leaves a void in the city involving urban and social segregation. The opportunity to rethink the typology of the station that the burial of the tracks means, should be a shift in the form of conceiving them. Intermodal Stations are an opportunity to transform the city, creating public spaces, developing green belts, promoting pedestrian and bicycle mobility; an opportunity to create a new topography to intensify the experience of the city as a collective process. What makes the project unique is having faced from its beginnings with an intensity divided between infrastructure and urbanism, landscape and architecture, ecology and economy; with a whole model of management that seeks quality and innovation in all moments of process and attends both quantitative and qualitative aspects. In this sense it may be said that it is a pioneering experience both on landform buildings as well as ecological urbanism.
27 users love this project
Comments
    comment
    user
    Enlarge image

    The station serves as a starting point of a new urban project, which re-establishes the connectivity between the North and South of the city and leads to a large public park where the roof is an integrated part giving its geometry and topography to the volume. All Stations in surface usually mean an abrupt interruption of urban continuity. Precisely, the urban element that is destined to unite and bring together the city with the territory, leaves a void in the city involving urban and social...

    Project details
    • Year 2011
    • Work started in 2009
    • Work finished in 2011
    • Client LIF 2002,SA (Ayuntamiento de Logroño, Comunidad autónoma de La Rioja, ADIF)
    • Contractor SACYR
    • Status Completed works
    • Type Railway Stations / Bus Stations / Passenger Terminals
    Archilovers On Instagram
    Lovers 27 users