this project does't mean to damage the pre-existent structure but it means to reproduce a shell of boxes,inside of wich we have included the different functions; consequently inside the castle we have use a dry tecnology, with metal structure and light plugging of
wood and glass and we have re-used the pre-existent access and the stairway of the castle.
the gotic tower is completed with the addition ,but the project want to recostruct
the stairway,mantening the different identity of the two unites.
a division of the external spaces inable an easier access from the very heart and from the parking area to the castle,and connect this to the journey uniting to the Vesone museum and the Arena circus.